| Circular
Letter No.
|
Subject
|
Date
|
|
|
Fire
Dampers |
28.5.1968
|
|
|
Air
Conditioning – Structural Ducts |
5.6.1968
|
|
|
Fire
Dampers – Coaming or Casing |
7.12.1968
|
|
|
Air
Conditioning Installations |
25.4.1969
|
|
|
The
Use of False Ceilings as Air Ducts |
3.4.1970
|
|
|
Insulation
for use with duct work or pipe work |
29.10.1970
|
|
|
Incorporation
of Smoke Detection System into Air Conditioning System |
10.12.1970
|
|
|
Electric
Heating Elements Used in Air Conditioning Installations |
2.3.1971
|
|
|
Thickness(in
metric sizes) of Mild Steel Sheet Used in Damper Construction |
16.4.1971
|
|
|
Electric
Heating Elements Used in Ventilation Installations |
1.2.1972
|
|
|
Building
(Ventilating Systems) Regulations, 1964 – Fire Dampers |
1.2.1972
|
|
|
Building
(Ventilating Systems) Regulations, 1964 – The Use of False
Ceilings as Air Ducts |
1.2.1972
|
|
|
Building
(Ventilating Systems) Regulations, 1964 – Insulation for use
with duct work or pipe work |
1.2.1972 |
|
|
Building (Ventilating Systems) Regulations, 1964 – Structural
Ducts |
1.2.1972
|
|
|
The Building (Ventilating Systems) (Amendment) Regulations,
1971 |
1.2.1972
|
|
|
Ventilation
Circular Letters – F.S.D. |
6.1.1975
|
|
|
Ventilation
Circular Letters – F.S.D. |
23.5.1983
|
|
|
Revision
of Ventilation Circular Letters No. V2 - Fire Dampers |
14.4.1984
|
|
|
Index
of Contents |
31.7.1985
|
|
|
Ventilation
Circular Letters - Chinese Translation |
26.6.1987
|
|
|
F.S.D.
Circular Letters (Ventilation)/89 |
18.12.1989
|
|
|
Changes
of Services Provided By The Fire Services Department in respect
of Ventilating System |
30.6.1990
|
|
|
Recognised
Testing Laboratories for Puncture Test |
30.1.1991
|
|
|
Checklist
for Mechanical Ventilating System |
5.1.1996 |
|
|
Duty
of Registered Specialist Contractor (Ventilation)
|
22.12.1998
|